Kitchen and bath remodels
For a remodel that opens walls, floors and ceilings, the survey applies where the rule covers it, and the lab results shape which materials come out before the carpenters arrive.
Typical cost in Cypress
Abatement happens before the remodel or teardown begins. The South Coast Air Quality Management District’s Rule 1403 puts the survey first and the district notice next, and demolition needs both.
Renovation includes installing or removing heating and air conditioning systems. Demolition is the wrecking or taking out of a load-supporting structural member, and that includes a bearing wall.

For a remodel that opens walls, floors and ceilings, the survey applies where the rule covers it, and the lab results shape which materials come out before the carpenters arrive.
When a wall that carries the roof comes out, the work is demolition, and the district notice applies no matter how large or small the house is.
A copy of the notification the district received goes to the building department with a demolition permit application, a step the district credits to state law. We handle the part before that, which is filing the notice online.
Adding on or converting a garage can mean taking out a load-supporting structural member. When it does, the job is demolition and the notice applies as well.
Check the Contractors State License Board number first. For work of 100 square feet or more, the C-22 Asbestos Abatement classification and Cal/OSHA registration come next.
Survey the whole house before the full remodel is drawn, so each phase starts from the same lab results instead of its own round of sampling.
The waste manifest belongs in your hands when the job is done.

Start with asbestos testing, or go back to the home page.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (657) 298-8930