Example Asbestos Removal Projects in Cypress

The seven example jobs below are set in Cypress, La Palma and Rossmoor, mostly in houses from the 1950s to the 1970s. Each one lists what was sampled, what came out, the work days and an estimated cost.

Ceiling texture and wall compound removed before a roof-bearing wall comes out

Example project

Home
1950s ranch house in unincorporated Rossmoor, with the wall between the living room and the family room carrying part of the roof
Original request
Take the wall out so the two rooms become one
Testing
A Cal/OSHA-certified asbestos consultant samples the ceiling texture, the wall compound and the floor tile near the wall
Found
Asbestos in the ceiling texture and the compound on both faces of the wall
Clear
The floor tile
Area
About 120 sq ft of ceiling and wall surface
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$4,200

Scope of work

Samples of each material, the district notice, both rooms sealed with air filters running, the ceiling texture and wall compound removed wet, bagging and the haul. The clearance air test, the beam and the framing are separate.

Project overview

In this example, the owners of a 1950s ranch house in unincorporated Rossmoor are joining the living room and the family room. The wall between them holds up part of the roof, so removing it counts as demolition and the district notice is needed even though the area is small.

The ceiling texture and the wall compound test positive. For the county permit, the contractor attaches the district notification to the asbestos disclosure that OC Public Works asks for with a demolition, and the framers set the beam after the air results.

The goal

The goal is a wall taken out after the positive materials on it are gone, so the framers work in cleaned rooms.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the ceiling, the wall and the floor.
  2. Before work The abatement contractor files the district notice online and attaches it to the county disclosure.
  3. Days one and two Both rooms are sealed and the ceiling texture and wall compound come off wet.
  4. Last An independent consultant tests the air, then the framers shore the roof and open the wall.

Planning right

  • Clear furniture from both rooms.
  • Ask the engineer to hold the beam order until the notice is filed.
  • Keep the district notice and the county disclosure together.
  • Plan the ceiling finish for after the framing.

Get a free quoteMore about renovation and demolition abatement

Ceiling texture removed from three bedrooms and the hall before a repaint

Example project

Home
1970s house in La Palma with textured ceilings in the three bedrooms and the hall
Original request
Smooth the ceilings and repaint the sleeping end of the house
Testing
A Cal/OSHA-certified asbestos consultant samples the texture in each bedroom and the hall
Found
Asbestos in the texture in all four spaces
Area
About 650 sq ft of ceiling
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$5,600

Scope of work

Four samples, the district notice, the bedrooms and the hall sealed with air filters running, the texture soaked and scraped into bags, a HEPA clean and the haul. The clearance air test and the smoothing and paint are separate.

Project overview

In this example, the owners of a 1970s house in La Palma want flat ceilings in the whole sleeping end of the house before they repaint it.

All four samples test positive. The abatement crew works through the bedrooms and the hall in turn, and the painter finishes the bare ceilings afterwards.

The goal

The goal is bare ceilings through the sleeping end of the house, ready for smoothing and paint.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples each bedroom and the hall.
  2. Before work The contractor files the district notice online and the family moves out of the bedrooms.
  3. Days one to three One space at a time is sealed, scraped and wiped down.
  4. Last An independent consultant tests the air before the painter starts.

Planning right

  • Take everything off the floors and walls the day before.
  • Plan where each person sleeps for the three work days.
  • Book the painter for after the air results.
  • Keep the lab report with the house papers.

Get a free quoteMore about popcorn ceiling removal

Floor tile and mastic removed from a sunken living room

Example project

Home
1970s two-story house in Cypress with a living room two steps below the entry
Original request
Replace the floor in the sunken living room with hardwood-look planks
Testing
A Cal/OSHA-certified asbestos consultant samples the tile at the step, in the middle of the room and by the fireplace, with the mastic under each
Found
Asbestos in the tile and the mastic
Area
About 260 sq ft of floor
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$3,600

Scope of work

Samples with the mastic beneath, the district notice, the room sealed with air filters running, the tile lifted and the mastic removed wet to the slab, bagging and the haul. The clearance air test and the new floor are separate.

Project overview

In this example, a Cypress family is replacing the floor of the sunken living room of their 1970s house. The old tile has cracked along the step.

The tile and its mastic test positive. The abatement crew takes both off the slab in two days, and the flooring contractor sets the new planks after the air results.

The goal

The goal is a bare slab in the sunken room, so the new floor is laid with no old mastic under it.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the tile in three places.
  2. Before work The contractor files the district notice online and the family empties the room.
  3. Days one and two The room is sealed and the tile and mastic are removed wet.
  4. Last An independent consultant tests the air, then the flooring order is released.

Planning right

  • Move furniture up to the entry level.
  • Cover the fireplace hearth if it stays.
  • Order the planks for after the air results.
  • Keep the lab report with the flooring contract.

Get a free quoteMore about floor tile and mastic removal

Primary bathroom sampled before a remodel

Example project

Home
1971 house in Cypress with a primary bathroom that still has its original finishes
Original request
Gut the bathroom for a new shower and vanity
Testing
A Cal/OSHA-certified asbestos consultant takes six samples of the floor covering, its mastic, the wall texture, the ceiling texture and the tub surround adhesive
Found
Asbestos in the floor mastic
Clear
The floor covering, the wall and ceiling texture and the surround adhesive
Timeline
Samples, then lab results, then a short report
Estimated testing cost
$600

Scope of work

A visit by the consultant, six samples, a lab result for each and a short report that marks the sample spots. Removing the floor mastic is priced on its own.

Project overview

In this example, a Cypress couple is gutting the primary bathroom of their 1971 house for a new shower and vanity. Before the demolition crew starts, they want to know what each surface is made of.

Only the floor mastic tests positive. The report shows each result, and the abatement crew is booked to remove the mastic before the remodel crew opens the room.

The goal

The goal is a list of what is in the bathroom, so the gut starts with the one positive material already handled.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the floor, the walls, the ceiling and the surround.
  2. Results The lab reports each sample, with the floor mastic positive and the rest clear.
  3. Next The abatement crew is booked to remove the mastic.
  4. Then The remodel crew starts once the floor is done.

Planning right

  • Clear the vanity top and the cabinet shelves.
  • Ask the consultant to mark each sample spot in the report.
  • Hold the remodel start until the floor is done.
  • Keep the report with the remodel contract.

Get a free quoteMore about asbestos testing and surveys

Wrapped attic ducts removed before the roofers work above them

Example project

Home
1950s house in unincorporated Rossmoor with its furnace ducts run through the attic
Original request
Reroof the house and replace the ducts at the same time
Testing
A Cal/OSHA-certified asbestos consultant samples the wrap on the trunk line, two branch runs and the tape at the joints
Found
Asbestos in the wrap on the trunk line and one branch
Clear
The second branch and the joint tape
Area
About 220 ft of duct in the attic
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$4,600

Scope of work

The attic hatch and vents sealed, wet removal of the wrapped duct into labeled bags, a cleanup and the haul. The survey, the clearance air test and the new ducts are separate.

Project overview

In this example, the owner of a 1950s house in unincorporated Rossmoor is having the roof replaced and wants the old ducts gone before roofers and the heating crew spend days in the attic. Removing the ducts counts as renovation, so the survey comes first.

The wrap on the trunk line and one branch tests positive. The abatement crew takes the whole run out first, and the new ducts go into a cleaned attic.

The goal

The goal is an attic with the wrapped ducts gone, so the roofing and new ducts happen with nothing positive overhead.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the wrap from the attic hatch.
  2. Before work The contractor files the district notice online and the roofer holds the start date.
  3. Days one and two The attic is sealed and the duct run is wetted, cut apart and bagged.
  4. Last An independent consultant tests the air, then the roofer and the heating crew start.

Planning right

  • Clear the hall floor under the attic hatch.
  • Ask the roofer to start after the air test.
  • Keep the lab report with the roofing contract.
  • Plan for the house to be without heat for a day or two.

Get a free quoteMore about HVAC duct and pipe insulation removal

Joint compound removed from a garage wall before storage cabinets go up

Example project

Home
1970s house in Cypress with a drywall wall between the garage and the laundry room
Original request
Hang a run of storage cabinets on the garage side of that wall
Testing
A Cal/OSHA-certified asbestos consultant samples the joint compound and the wall texture at four spots
Found
Asbestos in the joint compound
Clear
The wall texture
Area
About 80 sq ft of wall
Timeline
Less than 100 square feet of renovation, so no district notice, then one working day
Cost
$1,500

Scope of work

Plastic over the garage floor and the wall, the compound removed wet along the seams and the taped corners, bagging, a cleanup and the haul. The survey, the clearance air test, the new drywall finish and the cabinets are separate.

Project overview

In this example, the owners of a 1970s house in Cypress are lining the garage wall with storage cabinets. The seams of the drywall are covered in joint compound that has been sanded and painted over.

The survey rule does not reach less than 100 square feet of renovation in a single-unit house, yet the owners have the wall sampled first. The joint compound tests positive, so the abatement crew removes it before the installer drills into the wall.

The goal

The goal is a garage wall with the old compound gone, so the cabinets are drilled into a wall that has been handled.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the compound along the seams.
  2. Results The joint compound is positive and the wall texture is clear.
  3. Work day The wall is sealed with plastic and the compound is removed wet and bagged.
  4. Then The installer hangs the cabinets after the wall is refinished.

Planning right

  • Move cars and bikes out of the garage.
  • Clear the shelves along the wall.
  • Plan the refinishing of the seams before the cabinets.
  • Keep the lab report with the cabinet order.

Get a free quoteMore about drywall, joint compound and plaster removal

A whole house sampled once, before the full remodel is drawn

Example project

Home
1970s two-story house in Cypress where the owners plan to remodel nearly every room in phases
Original request
Draw the full remodel on one set of lab results
Testing
A Cal/OSHA-certified asbestos consultant samples the ceilings, floors, walls, duct wrap and the garage in every room
Found
Asbestos in the kitchen floor mastic and the ceiling texture in two upstairs bedrooms
Clear
The other rooms, the duct wrap and the garage
Timeline
Samples, then lab results, then a written report
Estimated testing cost
$1,300

Scope of work

A visit by the consultant, samples from every room, a lab result for each and a written report that marks where each sample was taken. Removing the positive materials is priced on its own.

Project overview

In this example, the owners of a 1970s two-story house plan to remodel most of it over several years. They sample the whole house once, before the plans are drawn, so every phase starts from the same results.

Two materials test positive: the kitchen floor mastic and the ceiling texture in two upstairs bedrooms. The report records what was sampled and where, and each phase picks up its own part of it.

The goal

The goal is one report for the whole house, so each phase of the remodel begins from known results.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples every room and the garage.
  2. Results The lab reports each sample, with two materials positive and the rest clear.
  3. Next The owners give the report to the designer before the plans are drawn.
  4. Then Each phase books its removal before its own remodel work begins.

Planning right

  • Unlock every room and the attic hatch.
  • Ask for the report to list each room separately.
  • Give a copy to the designer and each contractor.
  • Keep the original with the house papers.

Get a free quoteMore about asbestos testing and surveys

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (657) 298-8930

Call (657) 298-8930